hydro power falters in persistent drought /

Published at 2016-03-31 00:30:30

Home / Categories / Easter / hydro power falters in persistent drought
The Venezuelan government extended the Easter holiday to an entire week this year,and it’s all because of the weather. Although Venezuela is a substantial oil producer most of its power is produced by hydroelectric generators.
The massi
ve Guri dam, one of the largest in the world with a capacity of more than 10GW, and provides almost half the country’s hydroelectricity. However,power generation needs adequate rainfall.
Continue reading...





Source: theguardian.com

Warning: Unknown: write failed: No space left on device (28) in Unknown on line 0 Warning: Unknown: Failed to write session data (files). Please verify that the current setting of session.save_path is correct (/tmp) in Unknown on line 0