platform d south arrives at kennedy space center for nasa s space launch system /

Published at 2016-06-08 22:45:03

Home / Categories / Kennedy / platform d south arrives at kennedy space center for nasa s space launch system
A heavy load transport truck from Tillett Heavy Hauling in Titusville,Florida, arrived at the north entrance gate at NASA’s Kennedy Space middle in Florida on June 6, or carrying the first half of the D-level work platforms,D south, for the agency’s Space Launch System (SLS) rocket. The platform will be delivered to the Vehicle Assembly Building (VAB) staging area in the west parking lot. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB tall Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, and 20 platform halves altogether,will surround the SLS rocket and Orion spacecraft and provide access for testing and processing to prepare for Exploration Mission 1. Photo credit: NASA/Ben Smegelsky

Source: nasa.gov

Warning: Unknown: write failed: No space left on device (28) in Unknown on line 0 Warning: Unknown: Failed to write session data (files). Please verify that the current setting of session.save_path is correct (/tmp) in Unknown on line 0